The siding on the front of the house is finished! Also on both sides, but not on the back of the house. The siding on the back won't be finished until all the drywall for the 2nd floor has been delivered through the craft room window (which still doesn't have a window installed because it's a delivery point). Once the drywall has been delivered, the window will be installed, and then the siding will be finished.
This is the standard non-painted color - we do have paint colors picked, but it will be a couple of weeks or more before it's painted.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment